Drywall Hung, Ready for Finishes



There has been a lot of progress in the last week.  The entire house was drywalled in just 2 days and we are starting to get a better feel for the rooms and what they will look like.  This upcoming week will involve drywall tapping and finishing, prime & paint of walls and storing the wood floor onsite to acclimate to the conditions inside.  Also, the front and back door should be installed at some point this week.  We are still hoping that we will be moving in before then end of February, even though there is still a lot of work to be done.



Standing at front door looking at dining area.


Standing at front door looking at dining area, kitchen and stairs to second floor.


Standing at front door looking upstairs.  


Standing in SW corner of living room looking towards kitchen.


Standing in SW corner of living room looking towards stairs.



Standing in kitchen looking towards living room.



North side of kitchen.  Exhaust vent to roof.


Washer, dryer  area and tankless water heater in powder room.  All of this will be in a cabinet.



Powder room


Standing in SE corner looking towards living room and front door.


Standing in SE corner looking towards living room and front door.


Standing at front door looking towards living room.


Standing at stair landing looking downstairs.


Ceiling above stairs


Second floor hallway viewfrom stairs.


Hallway looking into Bedroom #3


Hallway looking into Bedroom #2


Looking into guest bathroom.


Bedroom #3 closet


Bedroom #2 closet



In Hallway looking into Master Bedroom.  Big closet on the left (for Gina), smaller closet on right (for Andy).


Andy's closet



 Gina's closet.  It is alot bigger than it looks in this picture. 


Master Bedroom


Standing in Master Bedroom looking into Master Bathroom 


 Standing into Master Bathroom looking into Master Bedroom. 


Master Bathroom Vanity Area


Master Bathroom Linen Closet 


 Master Bathroom Shower


 Master Bathroom Shower Bench and Toilet


 Standing in Shower looking towards Master Bathroom Entry


  Back deck.  Hopefully all of that trash is gone next week so I can take a picture of the whole thing.


Wednesday, January 25, 2012

Insulation Complete, Ready for Drywall

On Monday the front and back sides of the house were insulated with spray foam.  Today, insulation was installed above the second floor ceiling as well as in the wall on the south side.  We insulated this wall more for a sound barrier and did not feel that this was neccesary with the 3+ coarses of brick there are for the north wall.  Drywall is scheduled to start tomorrow.  I think the house will start to look more complete in the next week.  Work also completed since the last post was a new plywood subfloor on the 1st floor.  The house looks alot better with this completed.  They also built the frame for the back deck since the old gas service was disconnected and the gas pipes in the backyard were removed.